Main Menu
Home
About
About Petro Omid Asia
Petro Omid Asia
CEO Message
Managers
Teammate
Certificates
Petro Omid Asia Collection
social responsibility
Shareholders
Chart
Subsidiary companies
The activity of Petro Omid Asia
Internal construction report and internalized parts in Jask project
Innovative engineering measures in Jask project
Innovative implementation measures in Jask project
Innovative measures at the site of Omid oil tanks (Ganaveh)
Our Services
Projects
Terminated projects
Ongoing projects
Upcoming projects
Notices
News
Photo Gallery
Video gallery
Tenders and auctions
Contact us
فا
Home
About
Petro Omid Asia Collection
social responsibility
Shareholders
Chart
Subsidiary companies
About Petro Omid Asia
Petro Omid Asia
CEO Message
Managers
Teammate
Certificates
The activity of Petro Omid Asia
Internal construction report and internalized parts in Jask project
Innovative engineering measures in Jask project
Innovative implementation measures in Jask project
Innovative measures at the site of Omid oil tanks (Ganaveh)
Our Services
Projects
Terminated projects
Ongoing projects
Upcoming projects
Notices
News
Photo Gallery
Video gallery
Tenders and auctions
Contact us
فا
Innovative measures at the site of Omid oil tanks (Ganaveh)
Petro Omid Asia Company
Innovative measures at the site of Omid oil tanks (Ganaveh)
The construction of a project with a storage capacity of 10 million barrels of oil on the coast of the Oman Sea is unprecedented and is being built for the first time in Jask.
The unique way the system works in terms of receiving oil and sending them to SPM; In such a way, the piping and pumping system is designed in such a way that it is possible to send oil directly from the pipeline to SPM, as well as the possibility of simultaneously storing oil in tanks and sending it to SPM.
Taking into account the detailed considerations of passive defense in the field of design and implementation; So far, this range of defense requirements was not included in any project. The rules of using passive defense techniques in the design and implementation of structures will not only increase the cost for the enemy to disable the systems, but will also significantly increase the lifespan of the facilities.
In the bed modification methods of similar projects, it has been common to use the consolidation method for clay soils and dynamic compaction for sandy soils; But in this project, the use of soil and cement columns was a new method that was used.
Back to top